Terminals, rail ramps, and equipment depots in Portland

Last updated: Oct 24, 2026|First published: Jun 16, 2026

Oregon Container Terminal began its T6 operation in 2026. Portland freight also uses Lake Yard, UP Brooklyn’s Holgate entrance, and equipment yards across the Columbia.

Terminals, rail ramps, and equipment depots in Portland hero
Written by Jakhongir Mustafaev
Jakhongir Mustafaev Founder & Product Manager at Portmate

Terminals, rail ramps, and equipment depots in Portland

Portland’s container network follows two rivers and several distinct industrial districts. Terminal 6 is on the Columbia River in North Portland; BNSF Lake Yard is in Northwest Portland; UP Brooklyn is southeast of the Willamette. Equipment yards in Rivergate and Vancouver add their own stops to the journey. The facility on the shipping documents determines which part of that network a truck actually needs.

The marine operation also has a new identity. Oregon Container Terminal, or OCT, launched at Terminal 6 in January 2026 under Harbor Industrial. Older references to T6 remain useful for locating the property, but current operator instructions should govern appointments, release questions, and truck processing.

Loading terminal map...

Portland and Vancouver locations

Port and marine locations

FacilityAddress
Oregon Container Terminal7201 North Marine Drive, Portland, OR 97203

Rail ramps

FacilityAddress
BNSF Portland (Lake Yard) Intermodal Facility3930 Northwest Yeon Avenue, Portland, OR 97210
Union Pacific Portland (Brooklyn)1862 SE Holgate Boulevard, Portland, OR 97202

Equipment depots and yards

FacilityAddress
ConGlobal9639 N Rivergate Blvd, Portland, OR 97203
Portland Container - PCR9449 N Burgard Way, Portland, OR 97203
Mitchell Bros. Truck Line, Inc.600 SE Maritime Ave, Vancouver, WA 98661

Brooklyn’s address is 1862 Southeast Holgate Boulevard, matching . The shows entry from Holgate and a separate exit toward McLoughlin Boulevard. Follow the Holgate entrance instruction if an older routing sheet names Schiller Street.

Oregon Container Terminal’s 2026 operation

The Port of Portland’s documents the transition to Harbor Industrial. It preserves a local international container gateway for Oregon and neighboring inland markets. Whether it suits a particular shipment still depends on the booked ocean service, available equipment, inland costs, and cargo schedule.

The provides vessel information, gate cameras, a customer portal, and a trucker guide. Its published weekday truck entry cutoff is 16:00, with trucks already inside processed until 17:00; reefer transactions have an earlier 15:30 cutoff. Check the live notice and holiday schedule before assigning a truck. The distinction between last entry and the end of processing can determine whether a late-afternoon plan is workable.

A vessel’s arrival is only one milestone. Before arranging an import collection, verify that the container is discharged, available, and released, and that the trucker has the required transaction information. If a customs or freight hold remains, an appointment at the receiver does not resolve it. The responsible broker or cargo owner needs time to clear the exception before the carrier commits equipment.

For exports, work backward from the receiving window and vessel cutoff. The farm or shipper’s loading appointment, empty pickup, inspection of the container, and loaded delivery all need to fit that window. Agricultural cargo can make container condition especially consequential: an available empty may still be unsuitable if it is wet, contaminated, damaged, or inconsistent with the booking’s requirements.

Terminal 6 also accommodates other cargo activities. A vehicle, breakbulk, or warehouse collection should identify its operator and handling point rather than adopting the container gate procedure simply because the property is the same. The provides the broader facility context.

Lake Yard and Brooklyn serve different truck origins

BNSF’s Portland facility at 3930 Northwest Yeon Avenue is the Lake Yard reference. Consult the railroad’s for current access and service details. This is a Northwest Portland rail collection, separate from the Columbia River marine terminal. Use the rail notification’s facility and container number to establish readiness and the applicable equipment arrangements.

Brooklyn is on the other side of the Willamette in Southeast Portland. In addition to publishing Holgate Boulevard, UP’s terminal page distinguishes the main terminal’s operating hours from the adjacent annex’s shorter hours. If a release or pickup instruction assigns equipment to an annex, check that location’s window specifically. General round-the-clock terminal hours cannot answer every question about an individual yard transaction.

The two rail origins also create different trips to western suburbs, the Columbia corridor, or the Willamette Valley. A carrier needs the receiving address and actual ramp to assess the route. Quoting from a generic Portland point can hide a river crossing or an access constraint near the origin.

Keep the rail movement and the local truck work identifiable in the schedule. The railroad controls train handling and terminal availability; the drayage carrier controls its assigned collection and road delivery. When the cargo is running late, knowing which milestone is outstanding helps the shipper contact the right party and revise the warehouse appointment sensibly.

Rivergate equipment service and the Vancouver stop

The ConGlobal reference on North Rivergate Boulevard and Portland Container on North Burgard Way sit in the North Portland equipment district. describes storage, cleaning, repair, and modification services. Those are useful capabilities, but each requires an agreed work order and equipment authorization. A repair visit may involve a survey and approval process that differs from an ordinary empty interchange.

An exporter should arrange the empty release with the appropriate owner and inspect the assigned unit before leaving the yard. Report unsuitable equipment while replacement or repair can still be coordinated locally. Carrying it to a distant loading site first can create an avoidable return trip and threaten the export receiving window.

Mitchell Bros. is across the Columbia River at the Vancouver, Washington address in the directory. If it appears in the equipment instructions, include that crossing in the itinerary. A Portland delivery followed by a Vancouver equipment handoff has a different schedule from a return within Rivergate, even when both are described commercially as Portland work.

For definitions of interchanges, lifts, and equipment-related charges, the is a useful companion. The important local question is which service is actually ordered at each yard.

Building a reliable inland schedule

A Salem, Hillsboro, or Vancouver delivery should be planned from its real facility origin. Allow for the appropriate river crossing and the industrial approach to the gate, then compare the terminal collection window with the receiver’s unloading capacity. Do not schedule a driver around an assumed instantaneous interchange.

If the receiver retains the box, agree on where it will sit, who will report it empty, and when the carrier should return. If freight is to move onward in domestic equipment, arrange the cargo-handling facility before the ocean container is pulled. adds handling and another appointment, but it may suit an inland distribution plan better than sending the ocean equipment through every delivery stop.