Rail freight facilities in New Richmond, Wisconsin

Last updated: Oct 24, 2026|First published: Oct 24, 2026

New Richmond’s CN site serves the Twin Cities freight market, but WisDOT reports container intermodal service ended in 2025. Separate that history from auto traffic.

Rail freight facilities in New Richmond, Wisconsin hero
Written by Jakhongir Mustafaev
Jakhongir Mustafaev Founder & Product Manager at Portmate

Rail freight facilities in New Richmond, Wisconsin

CN's New Richmond property was developed to serve the Minneapolis–Saint Paul market from western Wisconsin. Its earlier container-terminal role remains visible in directories and opening announcements, but a later operating change matters more to someone planning a shipment: WisDOT reports that CN decided to cease container intermodal operations as its automotive business at the site grew.

For a new container booking, confirm the receiving ramp with CN or the service provider before arranging the truck. Older New Richmond routing material may refer to the former container service.

CN on Business Highway 64

Loading terminal map...
FacilityAddress
CN - New Richmond1099 Business Highway 64, New Richmond, WI 54017

Read the opening announcement alongside the later change

described a multipurpose New Richmond facility, including an automotive compound and a container terminal intended to serve Minneapolis and Saint Paul. The planned container business included agricultural exports, forest products, and imported consumer goods. That explains why New Richmond appears in Twin Cities intermodal material.

The later , states that CN officials informed WisDOT in February 2025 of the decision to cease intermodal operations, citing low container demand and space needed for growing automotive activity. The report distinguishes this change from the site's earlier container-terminal development.

These accounts describe different stages of the same property. The newer finding does not mean the physical railway site disappeared, and the older launch announcement does not establish that the container product is still offered. For a new booking, obtain a current service confirmation rather than treating the opening story as an operating schedule.

When paperwork still names New Richmond

Ask the booking provider to identify the cargo service and physical handoff it intends. An automotive rail movement, a container dray, and a truck delivery to an industrial customer require different instructions. A terminal name without the unit type can carry the wrong operational assumption into dispatch.

For an ocean-container shipment, request the current inland destination, responsible railroad or service provider, and the place where the unit will become available. If older paperwork names New Richmond, reconcile it with the present routing before reserving the truck and receiver appointment. Do not send a driver to the site to discover whether the historical service remains possible.

For vehicle freight, ask the responsible operator for its assigned gate and receiving or release process. The continued automotive role reported by WisDOT does not establish public access, a vehicle-collection entitlement, or a particular carrier's appointment. Use the shipment authorization and the operator's current direction.

If the provider confirms a changed container destination, carry that change into the delivery mileage, expected arrival, equipment plan, and empty return. Correcting only the ramp name while retaining an old local-truck assumption leaves an incomplete transport order.

New Richmond still belongs in the Twin Cities story

The facility was conceived around a market extending across the Minnesota–Wisconsin boundary. A Wisconsin location serving Twin Cities customers is not a geographic error. The practical issue is which freight service is available now and where the booked container or vehicle is actually handled.

For container alternatives, ask the provider to identify a current Minnesota or other inland ramp under the proposed service. The describes the Kasota and Shoreham facilities and nearby equipment yards. Saint Paul's BNSF Midway is another separate Twin Cities location. Their existence does not mean every rail booking can be redirected to them.

Compare the whole service from the confirmed origin to the real receiver, whether in western Wisconsin, Minneapolis, Saint Paul, or another part of the region. Include cargo availability, final delivery, any handling, and equipment termination. A shorter road leg is useful only when the underlying rail product and release are available for the shipment.

Avoid carrying old equipment assumptions into a new route

Container planning includes more than the rail arrival. An exporter needs an approved empty pickup, suitable equipment condition, a loading appointment, and a loaded receiving destination. An importer needs a customer delivery arrangement and an authorized place to terminate the empty. None of those should be inferred from an obsolete New Richmond container routing.

Where a new itinerary requires cargo transfer at a warehouse, distinguish that handling order from depot interchange. Provide the packaging, dimensions, weight, labor requirements, and outbound vehicle. Our explains the separate responsibilities.

Keep the corrected routing confirmation with the shipment file. That gives the trucker, receiver, and equipment coordinator the same current destination, while preserving the useful historical explanation for why an older document referred to New Richmond in the first place.